Information on Erosion Control

  • No person shall conduct any land-disturbing activity within the jurisdiction boundaries of the City of Cumming without first obtaining a permit from the City of Cumming Planning and Zoning Department to perform such activity.
  • Whenever feasible, natural vegetation shall be retained, protected and supplemented.
  • Cut-fill operations must be kept to a minimum.
  • Disturbed soil shall be stabilized as quickly as practicable
  • Temporary vegetation or mulching shall be employed to protect exposed critical areas during development.
  • Permanent vegetation and structural erosion control measures shall be installed as soon as practicable.
  • Erosion control must be installed and maintained until final stabilization.
  • Storm water storage shall retain at a minimum a 2,10,25,50 and 100 year, 24-hour storm without any increase in run-off.
  • Inspectors may visit job site at any time to inspect erosion control and construction entrances to verify compliance.

Planning & Zoning Contacts

Department Director

Scott Morgan
s.morgan@cityofcumming.net
Phone: 770-781-2024
Fax: 770-781-2029

Administrative Assistant

Barbara Rockmore
brockmore@cityofcumming.net
Phone: 770-781-2024
Fax: 770-781-2029

Chief Building Official

Everett Thompson
e.thompson@cityofcumming.net
Phone: 770-781-2024
Fax: 770-781-2029

Electrical Inspector

Stanley Pirkle
s.pirkle@cityofcumming.net
Phone: 770-781-2024
Fax: 770-781-2029